Wireless Solution T-1 Manual do Utilizador Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 25
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
SilRi t
Aliti Pfil
S
pec
i
a
l
R
equ
i
remen
t
-
A
pp
li
ca
ti
on
P
ro
fil
es
Hospitals
Tenting, incumbent installer, conduit, core drilling, work hour restrictions, validation of
di (ld
li d ll ) d fi iti f i t ( O ti
d
raw
i
ngs
(l
ea
d
-
li
ne
d
wa
ll
s
)
, proper
d
e
fi
n
iti
on o
f
coverage requ
i
remen
t
s
(
e.g.
O
pera
ti
ng
Rooms, boiler rooms, etc.).
Campus
Incumbent installer validation of facility drawings and fiber map conduit work hour
Incumbent
installer
,
validation
of
facility
drawings
and
fiber
map
,
conduit
,
work
hour
restrictions, core drilling, high lift
Manufacturing
Conduit
,
work hour restriction
,
lift
,,
Airport
Security clearance, badging, conduit, work hour restriction, lift
Hospitality
Work hour restrictions, historic architecture
Corporate Office
Conduit, work hour restriction, aesthetics, executive row
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 24 25

Comentários a estes Manuais

Sem comentários